Market: Industrial
Location: YTO – Willow Run Powertrain
Customer: General Motors
Project: HVAC Renovation
Start Date: 4/1/04 Completion Date: 11/1/04


General Motors Willow Run Powertrain took existing space that was not being used and converted it into a new transmission production facility. The existing HVAC systems had not been maintained due to a lack of use. TMI was contracted to survey the existing HVAC system and report back to General Motors the condition and possibility of converting the units to a more efficient system.

Upon award of the HVAC refurbishment contract, TMI proceeded to re-work the existing components in preparation for new internal equipment. The following equipment was installed in the sixteen existing air-handling units:

Intake dampers and return air dampers
Mist Collection filters and final filters
Burner and gas train assembly
Supply fan motor, bearings, sheaves on spring isolators
PLC controls temperature controls and Motor Controls
Exhaust fan start panels with interlock.

Major Equipment used for installation:

Fork Trucks
Hydraulic Cranes
Construction Helicopters
JLG, Scissor Lifts and Single man lifts

TMI provided a complete turnkey system from engineering, fabrication, installation and commissioning. The project was completed on schedule and thanks to some cost savings ideas we were able to finish under General Motor's budget.

TMI’s expertise in HVAC systems has made us the leader in turnkey air supply house refurbishment. Planning, cooperation, experience and sheer hard work has resulted in unsurpassed customer satisfaction.