test
leftsidepage4
 
Market: General Industrial/Tier I
Location: Grand Rapids, MI
Customer: Spectrum Industries
Project: Paint Line Renovation
Completion:
September 2003

The facility was having several issues with holding temperature and maintaining a clean work environment during the paint process of their target product. TMI teamed up with outside engineers to design a new custom air system that would improve the overall results of the paint finishing process, and increase productivity.

TMI proposed and engineered (3) complex air handling units, packaged with a boiler and chiller system as a turnkey package to the owner. The air handling units consisted of chilled water cooling, hot water heating, spray coil type humidification, and a series of bag type filtration. This was all pre-piped to both pre-package chiller and boiler assemblies. TMI also engineered a turnkey temperature and motor controls system.

This project was built for just in time delivery to accommodate the installing contractor. Once the installation was complete TMI sent our engineering and start up technicians to site to bring the complete system on line.