Market: Government
Location: Detroit, MI
Project: Detroit Waste
Water Treatment Plant
Completion: April 2004
Being a true custom manufacturer has provided
opportunities like the Detroit Waste Water Project. TMI was commissioned
to provide air-handling units that would provide longevity in
a highly destructive environment.
Due
to the corrosive atmosphere TMI engineers designed units that
were made out of 304 stainless steel. All interior components
that could not be manufactured out of stainless steel were treated
with a corrosion resistant epoxy coating. Motor controls and roof
curbs also were provided to insure the longevity of the units.
TMI
has found that by stepping out of the box and truly being a custom
manufacturer provides us with the flexibility to provide the product
best suited for our clients needs.
|