Market: Automotive
Location: Delta Township, Michigan
Customer: General Motors Corporation
Project: Delta Township Assembly
Completion: December, 2004

The new General Motors Assembly plant in Delta Township, MI, required 36 custom air-handling units at 60,000 cfm each to meet the HVAC needs of the facility. The challenge was to provide just in time delivery throughout the construction process for each unit as they were needed. TMI met the delivery needs on every unit without fail.

There were a variety of units that were needed on the project. Of the 36 units 6 were Direct Fired Natural Gas and the remaining 30 utilized combination cooling/heating coils. 16 of the units required a pulse jet filter wall with a cylindrical media system. All of the units utilized 2” foam wall construction. The exterior skin of the unit matched the building exterior to eliminate architectural screening and provide unsurpassed aesthetics.

TMI delivered each custom unit pre-piped and pre-wired to a single point connection complete with temperature and motor controls. The units with direct-fired burners were shipped complete with fire suppression sprinkler systems installed and pre-piped.

TMI continues to push forward by meeting the quality, efficiency and schedule requirements set forth by our clients.